April 28. 1984
Aerial view looking westbound, with some works in progress:
on the left, the foundations for the futur railway station and below right,
the enlargement of the wide-bodies' Apron. Note that the parking
positions "60" not yet exists (still grass surfaces on the right), the aircrafts
in front of the main terminal are still parked diagonaly (no push back was
required, except for the Airbus A310, with a Swissair sample here).
Below right of the image is the giant mobile "crane", which served for the
runway and apron slab pavement replacement.
Aucun commentaire:
Enregistrer un commentaire